2007-08-27 12:46 PM
After visiting Fizz on Sunday, the Saturn turned over to 100K.
I'm down to the point of jacking up the lower A arm and disconnecting the lower ball joint to be able to pull the Isuzu's
half-shafts. Getting everything greased and back together doesn't look like it's going to be much fun. Should go a bit quicker than the disassembly. I need to wait for a good painting day, to apply the caliper paint to the hub unit and brake calipers. So that'll delay my getting started on the rear for a few days.
0 Comment(s) Permalink